Oracle Database Installation Guide 11g Release 2 (11.2) For Microsoft Windows

I understand the heavy workload while plotting will kill the SSD eventually, Crystal disk info tells me the last 3-4 weeks of plotting with hard disk utilisation at near 100% 24x7 have resulted in 85% of the drive being good (or 15% of life having been expended).