The power supply required for the project will initially be generated onsite, using two diesel generator units of 2,500ekW each with an additional generator on standby. The mine will later receive power from the regional grid via a new powerline that is estimated to be available from the second year of operations. Water supply will be sourced from production wells within the property. A reverse osmosis water treatment system will be used to produce potable water. A 30-people accommodation camp is located in San Tiburcio with single and multi-room layouts, which will be expanded once construction activities begin.