The FPU is accepted or rejected based upon the fabric sampling plan criteria. If 15 consecutive FPUs of a fabric are accepted, the number of linear yards of fabric in the FPU may be increased. If an FPU is rejected, subsequent FPUs must be tested with a third sample of five specimens taken from the middle of the FPU.